
في:
قيد الإنشاء|
بيع أولي
الخريطة
اطلب فيديو


11
شقة في سانست باي ٣ من إمتياز،جزر دبي 1 غرفة 1899875 درهم - 12159595
Project Overview:
Sunset Bay Phase 3 by Imtiaz Developments is a prestigious waterfront residential project located in the heart of Dubai Islands. This 11-story tower is the latest addition to the highly successful Sunset Bay series, bringing modern luxury to one of Dubai’s most sought-after locations. Designed by Jouzy Consulting Engineers, the project offers contemporary architecture paired with breathtaking views of the Arabian Gulf.
Prime Location:
Contact the Area Specialist: Talal
Sunset Bay Phase 3 by Imtiaz Developments is a prestigious waterfront residential project located in the heart of Dubai Islands. This 11-story tower is the latest addition to the highly successful Sunset Bay series, bringing modern luxury to one of Dubai’s most sought-after locations. Designed by Jouzy Consulting Engineers, the project offers contemporary architecture paired with breathtaking views of the Arabian Gulf.
Prime Location:
- Situated in Dubai Islands, formerly known as Deira Islands
- Direct access to pristine beaches
- Close to iconic Dubai landmarks and attractions
- Easy connectivity to public transport, major highways, and the city’s key locations
- Just 15 minutes from Dubai International Airport
- State-of-the-art fitness center and dedicated yoga studio
- Indoor and outdoor swimming pools for relaxation
- Spa, sauna, and wellness facilities for ultimate rejuvenation
- Beautiful rooftop garden and stylish social lounges
- Flexible co-working spaces and a fully-equipped business center
- Delivery Date: February 2027
- Sale Start Date: March 1, 2025
- Location: Dubai, Deira, Dubai Islands, Sunset Bay 3
- Payment Plan: 20/40/40
- Number of Buildings: 1
- Property Types: Apartments
- Government Fee: 4%
- 20% Down Payment at sales launch
- 40% During Construction
- 40% Upon Handover
Contact the Area Specialist: Talal
معلومات عن العقار
- نوع العقارشقة
- نوع العرضللبيع
- الرقم المرجعيبيوت - 103577-VUhb7a
- حالة البناءقيد الإنشاء
- TruCheck™ في8 يوليو 2025
- تاريخ الإضافة8 يوليو 2025
- تاريخ التسليمالربع 1 من عام 2027