
في:
قيد الإنشاء
المخططات الطابقية
الخريطة



11
320 ريفرسايد كريسنت، ريفرسايد كريسنت، شوبا هارتلاند 2، بوكدرة، دبي
2 غرفة
2 حمام
1,086 قدم مربع
شقة في 320 ريفرسايد كريسنت،ريفرسايد كريسنت،شوبا هارتلاند 2،بوكدرة 2 غرف 3100000 درهم - 12121130
Presenting 320 Riverside Crescent by Sobha Group – a 57-storey high-rise offering elegant 1, 1.5, 2, and 3-bedroom waterfront apartments in the heart of Sobha Hartland 2.
This newly launched development is designed for those seeking an elevated lifestyle with direct access to tranquil waterfront views, open podiums, and spacious balconies that overlook Dubai’s skyline and Dubai-Al Ain Road.
Located in a prime area of Dubai, the community provides seamless access to Downtown Dubai, schools, retail centers, business hubs, and healthcare facilities. The upcoming metro connectivity and easy access to major roads ensure smooth travel across the city.
Key Highlights:
Amenities:
This newly launched development is designed for those seeking an elevated lifestyle with direct access to tranquil waterfront views, open podiums, and spacious balconies that overlook Dubai’s skyline and Dubai-Al Ain Road.
Located in a prime area of Dubai, the community provides seamless access to Downtown Dubai, schools, retail centers, business hubs, and healthcare facilities. The upcoming metro connectivity and easy access to major roads ensure smooth travel across the city.
Key Highlights:
- 1, 1.5, 2 & 3-bedroom luxury apartments
- Stunning views of city skyline and waterfront
- Direct access to podiums and open spaces
- Smart design with natural light and ventilation
- Premium finishes and contemporary interiors
- Located in Sobha Hartland 2, near major landmarks
Amenities:
- Swimming pools and leisure decks
- Fitness center and yoga zones
- Kids’ play areas and outdoor spaces
- Walking tracks and landscaped gardens
- 24/7 security and concierge services
معلومات عن العقار
- نوع العقارشقة
- نوع العرضللبيع
- الرقم المرجعيبيوت - 4799-E0bZbL
- حالة البناءقيد الإنشاء
- TruCheck™ في9 يوليو 2025
- تاريخ الإضافة3 يوليو 2025
- تاريخ التسليمالربع 3 من عام 2027