Wohnungen Verkauf in DubaiDubai Hills EstateParkside HillsBayut - 81724996-6ba9-464a-844f-f7054cda917e

am
Off-Plan|
Wiederverkauf
Karte



10
Wohnung in Dubai Hills Estate,Parkside Hills, 2 schlafzimmer, 2999999 AED - 16872208
Huspy presents this 2-bedroom apartment on a high floor, with views towards Dubai Hills Park and Burj Al Arab and handover scheduled for Q1 2027.
- 2 bedrooms
- 2 bathrooms
- High floor
- Dubai Hills Park view
- Burj Al Arab view
- Partial villa view
- Open-plan layout
- Kitchen appliances included
- Walk-in wardrobe in the master suite
- Close to the mall and park
- Q1 2027 handover
- Access to Umm Suqeim Road and Al Khail Road
The apartment features an open-plan living area with an equipped kitchen and a master suite with a walk-in wardrobe. Its high-floor position provides views across Dubai Hills Park towards Burj Al Arab, with a partial villa outlook also forming part of the unit’s view.
The property is scheduled for handover in Q1 2027 and is positioned close to the mall and park, with road access via Umm Suqeim Road and Al Khail Road.
Contact Huspy for further property and handover details.
- 2 bedrooms
- 2 bathrooms
- High floor
- Dubai Hills Park view
- Burj Al Arab view
- Partial villa view
- Open-plan layout
- Kitchen appliances included
- Walk-in wardrobe in the master suite
- Close to the mall and park
- Q1 2027 handover
- Access to Umm Suqeim Road and Al Khail Road
The apartment features an open-plan living area with an equipped kitchen and a master suite with a walk-in wardrobe. Its high-floor position provides views across Dubai Hills Park towards Burj Al Arab, with a partial villa outlook also forming part of the unit’s view.
The property is scheduled for handover in Q1 2027 and is positioned close to the mall and park, with road access via Umm Suqeim Road and Al Khail Road.
Contact Huspy for further property and handover details.
Objektinformationen
- TypWohnung
- ZweckVerkauf
- Referenznr.Bayut - 81724996-6ba9-464a-844f-f7054cda917e
- FertigstellungOff-Plan
- TruCheck™ am15. Oktober 2026
- Hinzugefügt am15. Oktober 2026
- ÜbergabedatumQ2 2028











