برج سنترال بارك السكني، أبراج سنترال بارك، مركز دبي المالي العالمي، دبي
1 غرفة
1 حمام
1,123 قدم مربع
شقة في برج سنترال بارك السكني،أبراج سنترال بارك،مركز دبي المالي العالمي 1 غرفة 105000 درهم - 6382769
POSITIVE PROPERTIES PROUDLY PRESENTING LUXRY 1 BEDROOM APARTMENT IN DIFC FOR RENT
Unfurnished
Balcony
Built in Wardrobes
Central A/C
Children's Play Area
Concierge
Covered Parking
Pets Allowed
Security
Shared Gym
Shared Pool.
The project was originally named the Islamic Bank Towers but was changed to Arady Towers in 2010 and then finally to Central Park Towers prior to opening. Don't let the name fool you though - the only nearby park is the car park.
Construction began in 2007 but was severely delayed in 2010 when Hopkins Architects sued the developer Dubai Properties Group for AED 27 million over unpaid fees and costs. Dubai Properties, who claimed to have paid the firm for work completed, then counter-sued for loss of services. The case was eventually settled out of court but construction didn't resume until 2013.
Both towers were designed with tall spires which would have significantly raised the heights of the buildings. They were unfortunately cancelled midway through construction which explains the slightly unfinished look of the central cores.
Handover of apartments in the residential tower began on March , six months later than planned.
for more information feel free to contact
Unfurnished
Balcony
Built in Wardrobes
Central A/C
Children's Play Area
Concierge
Covered Parking
Pets Allowed
Security
Shared Gym
Shared Pool.
The project was originally named the Islamic Bank Towers but was changed to Arady Towers in 2010 and then finally to Central Park Towers prior to opening. Don't let the name fool you though - the only nearby park is the car park.
Construction began in 2007 but was severely delayed in 2010 when Hopkins Architects sued the developer Dubai Properties Group for AED 27 million over unpaid fees and costs. Dubai Properties, who claimed to have paid the firm for work completed, then counter-sued for loss of services. The case was eventually settled out of court but construction didn't resume until 2013.
Both towers were designed with tall spires which would have significantly raised the heights of the buildings. They were unfortunately cancelled midway through construction which explains the slightly unfinished look of the central cores.
Handover of apartments in the residential tower began on March , six months later than planned.
for more information feel free to contact
معلومات عن العقار
- نوع العقارشقة
- نوع العرضللايجار
- الرقم المرجعيبيوت - RL180864
- تاريخ الإضافة29 سبتمبر 2022
المزايا والخدمات
شرفة أو تراس
نظام تبريد مركزي
ردهة إستقبال
صالة رياضية أو نادي صحي
البحث الشائع
الموقع والأماكن القريبة
الموقع
المؤسسات التعليمية
المطاعم
المستشفيات
المتنزهات
هذا العقار لم يعد متوفرا بعد الآن
بوزيتيف للعقارات
وكيل العقار:Samir Jamaludeen - RG