
于
期房|
首次销售
地图
请求视频


15
位于山谷小区,Ovelle 5 卧室的别墅 8974888 AED - 16635977
The Valley is Emaar's nature-inspired masterplan along Dubai-Al Ain Road, built around wadis, meadows, and its own 47,000 sqm Golden Beach. Ovelle brings that biophilic vision to low-density villa living — earthy façades, open-plan interiors, and homes designed to recenter daily life around comfort, space, and the surrounding landscape, all with Emaar's proven build quality behind it.
Key Highlights:
* 5-Bedroom | 5,639 sq. ft BUA | 7,326 sq. ft Plot
* Guest bedroom on the ground floor
* Private lift
* Fully ensuite lounge on the top level — convertible to a 6th bedroom
* Show kitchen plus a separate closed preparation kitchen
* Access to Golden Beach, Village Market Plaza, and Canopy Walk
* Sports courts, swimming pool, gym, and high ropes & zip line circuit
Location and Proximity
* Direct access to Dubai-Al Ain Road (E66)
* 25 mins to Downtown Dubai
* 30 mins to Dubai International Airport
* 20 mins to Expo City and Dubai South
Payment Plan
* 20% On Booking
* 60% During Construction
* 20% On Handover in Q4 2029
To arrange a private presentation and detailed walkthrough, contact:
Mohnish Manghnani
Private Client Manager
BRN: 65726
Key Highlights:
* 5-Bedroom | 5,639 sq. ft BUA | 7,326 sq. ft Plot
* Guest bedroom on the ground floor
* Private lift
* Fully ensuite lounge on the top level — convertible to a 6th bedroom
* Show kitchen plus a separate closed preparation kitchen
* Access to Golden Beach, Village Market Plaza, and Canopy Walk
* Sports courts, swimming pool, gym, and high ropes & zip line circuit
Location and Proximity
* Direct access to Dubai-Al Ain Road (E66)
* 25 mins to Downtown Dubai
* 30 mins to Dubai International Airport
* 20 mins to Expo City and Dubai South
Payment Plan
* 20% On Booking
* 60% During Construction
* 20% On Handover in Q4 2029
To arrange a private presentation and detailed walkthrough, contact:
Mohnish Manghnani
Private Client Manager
BRN: 65726
物业信息
- 类型别墅
- 目的待售
- 编号Bayut - VI13874
- 完成期房
- 家具情况无家具
- TruCheck™ 于2026年9月25日
- 房源最早添加于2026年9月25日
- 交付日期2029第4季度















