
于
期房|
转售
户型图
地图



10
位于迪拜码头,Marina Cove 2 卧室的公寓 3300000 AED - 16155000
White & Co are pleased to present this exceptional two-bedroom residence in Emaar’s final new-build development in the Marina, which is set to be one of the community’s landmark addresses.
The apartment offers a spacious 1,237 sqft layout comprising two bedrooms, three bathrooms, two balconies, and a walk-in wardrobe. Positioned on a mid floor, the apartment has been thoughtfully designed to maximise both space and natural light whilst offering the quality and finish expected from an Emaar development.
With handover scheduled for 2029 and approximately 50% remaining on the payment plan, this presents an attractive opportunity for both investors and future end users. Residents will benefit from swimming pool, fully equipped gym, landscaped terrace with panoramic views, relaxation gardens, and an outdoor fitness area.
Ideally located on the Al Marsa Street side of Dubai Marina, residents will enjoy immediate access to Marina Mall, the Walk, and a swift connection onto SZR, combining waterfront living with outstanding convenience.
The apartment offers a spacious 1,237 sqft layout comprising two bedrooms, three bathrooms, two balconies, and a walk-in wardrobe. Positioned on a mid floor, the apartment has been thoughtfully designed to maximise both space and natural light whilst offering the quality and finish expected from an Emaar development.
With handover scheduled for 2029 and approximately 50% remaining on the payment plan, this presents an attractive opportunity for both investors and future end users. Residents will benefit from swimming pool, fully equipped gym, landscaped terrace with panoramic views, relaxation gardens, and an outdoor fitness area.
Ideally located on the Al Marsa Street side of Dubai Marina, residents will enjoy immediate access to Marina Mall, the Walk, and a swift connection onto SZR, combining waterfront living with outstanding convenience.
物业信息
- 类型公寓
- 目的待售
- 编号Bayut - RL-238897
- 完成期房
- 家具情况无家具
- TruCheck™ 于2026年8月18日
- 房源最早添加于2026年8月12日
- 交付日期2029第4季度











