
于
期房|
首次销售
地图
请求视频


10
位于朱美拉环形村(JVC),JVC第12区,Lucky Oasis Residence 2 卧室的公寓 1550000 AED - 16099720
Aeon & Trisl Real Estate presents you this amazing property in Lucky Oasis Residences, in Jumeirah Village Circle, Dubai, UAE.
Large Study Room, Balcony
Extra Bathroom with Shower
with private pool, with Highest ROI
Ideal Location JVC Dubai.
Located right in the heart of Dubai within a 15-minute drive to Downtown Dubai, Palm Jumeirah, Mall Of The Emirates Al Barsha 1, and other key destinations.
Selling Price:
1,550,000/-
With Plunge Pool
View: Beach Pool
Payment Plan :
10% on Booking
10% after 30 days
5% after 90 days
5% after 180 days
3.75% in 8 Quartly Installments
40% on Handover
Handover Date Q3 2026
Come and discover the ideal place to call home at Lucky Oasis Residence.
Amenities:
Beach Pool
Golf Simulator
Mini Golf Course
Gaming Facility
Balcony Plunge Pool
Shallow Water Pool
Smart Homes
Podium Garden
BBQ Areas and Gazebo
Kids' Pool
Rooftop Garden
Private Pool
Smart Homes
Infinity Pool
Rooftop Garden
Gym with aerobics and Yoga facilities
Indoor/Outdoor Kids Play Areas
Large Study Room, Balcony
Extra Bathroom with Shower
with private pool, with Highest ROI
Ideal Location JVC Dubai.
Located right in the heart of Dubai within a 15-minute drive to Downtown Dubai, Palm Jumeirah, Mall Of The Emirates Al Barsha 1, and other key destinations.
Selling Price:
1,550,000/-
With Plunge Pool
View: Beach Pool
Payment Plan :
10% on Booking
10% after 30 days
5% after 90 days
5% after 180 days
3.75% in 8 Quartly Installments
40% on Handover
Handover Date Q3 2026
Come and discover the ideal place to call home at Lucky Oasis Residence.
Amenities:
Beach Pool
Golf Simulator
Mini Golf Course
Gaming Facility
Balcony Plunge Pool
Shallow Water Pool
Smart Homes
Podium Garden
BBQ Areas and Gazebo
Kids' Pool
Rooftop Garden
Private Pool
Smart Homes
Infinity Pool
Rooftop Garden
Gym with aerobics and Yoga facilities
Indoor/Outdoor Kids Play Areas
物业信息
- 类型公寓
- 目的待售
- 编号Bayut - Portal-AT-404152
- 完成期房
- 家具情况配备家具
- TruCheck™ 于2026年8月7日
- 房源最早添加于2026年8月7日
- 交付日期2026第3季度














